GS Plastic Optics (Rochester, N.Y.) is touting how it has reduced lead times for its single-point diamond turning point operations. The result, according to GS Plastic Optics, is that it is now capable of turn-around times as little as 4-6 weeks depending on material availability and design complexity. The company achieved reduced lead times through...The post GS Plastic Optics boasts reduced turn-around times appeared first on Medical Design and Outsourcing.