We've kicked off our first round of pre-production, called the Engineering Validation Test (EVT), with our manufacturer Flex in Zhuhai, China.After EVT 1, there is a second round of EVT, called EVT 2, where any necessary changes are implemented. Then, we enter Design Validation Test (DVT) in early January.