Blog Author: Nick Misch, Sr. Project Manager, Stevenson Crane Service, Inc. Installing an overhead crane is normally completed with the use of 2 mobile cranes, one on each end of the beam. Typically this is done before the roof is built which eliminates headroom issues. The beam must be turned 40° to enable it to [...]The post Using An 80,000 Capacity Telehandler To Place A 30 Ton Capacity Overhead Crane With Just Inches Of Side & Headroom appeared first on Stevenson Crane Service, Inc..